Siding Estimating and Takeoff Services
We quantify siding from your elevations and wall sections — cladding by system and area, plus the water-resistive barrier, flashing, trim and accessories behind and around it — and deliver an editable Excel workbook with the marked-up plan set.
Get a Free QuoteWhat We Take Off
Siding estimates go wrong in the space between the cladding and the sheathing. The visible material is straightforward to measure; the assembly that keeps water out of the wall is where the cost and the risk sit. Water-resistive barrier, flashing at every opening and transition, furring for a drained and vented cavity, and the trim that terminates it all are separate measured items, and they are the difference between a wall that performs and a callback.
How Siding Quantities Are Measured
Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.
Who This Is For
General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.
Subcontractors pricing their own scope in this division.
Developers and owners validating a number they've already been given.
Material suppliers and distributors verifying a customer's order.
What You Receive
- An itemized Excel takeoff, organized by division
- A marked-up plan set — every quantity traces back to a location on the drawings
- Labor, material and equipment split out separately
- Waste and overage factors shown as visible line items
- An assumptions and exclusions schedule
What Moves the Number on Siding
What is behind the cladding. The water-resistive barrier, the drainage cavity, the flashing at every opening and transition, and the sealant joints are the assembly. They are also where the failures happen. An estimate that measures the face and allows a percentage for everything behind it has priced the cheap half and guessed at the consequential one.
Flashing detail count. Flashing is measured per condition, and the count depends on the building rather than its area. A heavily fenestrated elevation with multiple roof-to-wall intersections has several times the flashing of a blank wall of the same size. Kickout flashing at roof-wall junctions is the clearest example — small, inexpensive, and the single most common cause of concealed wall rot when it is left out.
Rainscreen and furring. A drained and vented rainscreen cavity adds furring, cavity closure, venting, insect screen and a longer fastener that must reach structure through the cavity and any continuous insulation. It is a genuinely different assembly from direct-applied cladding, and treating the two as the same square foot is a large understatement.
Material system. Fibre cement, vinyl, wood, engineered wood, metal panel and masonry veneer differ in material cost, in installed labor, in the trim they need and in the substrate they demand. Masonry veneer in particular brings a shelf angle, ties, weeps and a drainage cavity, and it is a different trade in all but name.
Exposure and layout. Lap exposure sets the number of courses and therefore both material and labor for a fixed wall area. Panel layout decides waste. Neither is visible from an area figure, and both are read from the elevations and details rather than assumed.
Wind design and fastening. Cladding attachment is a wind-driven requirement, with corner and edge zones needing higher fastener density than the field. On coastal and high-wind sites this also drives fastener material for corrosion resistance and can restrict which systems are permitted at all.
Access and building height. Siding is an exterior trade worked entirely from access equipment above the first storey. The split between ladder, scaffold, lift and swing stage changes the labor rate for an identical square foot, and staging and protection on a constrained site are their own cost.
What We Need From You
A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.
- Exterior elevations for all faces, with materials and extents identified
- Wall sections and exterior details — the governing documents for this trade, since they show the assembly behind the cladding
- Flashing details at openings, roof-to-wall transitions, foundations and penetrations
- Window and door schedules, for opening counts and surround conditions
- Specification section for Division 07 siding and the water-resistive barrier
- Wind design criteria — design wind speed and exposure category — for the attachment requirements
- Joint and sealant schedule where one is provided
- For re-clad work: existing assembly information, substrate condition and any hazardous materials survey
How It Works
- 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
- 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
- 3 Approve — nothing starts until you confirm.
- 4 We take it off — quantities from the drawings and schedules.
- 5 Delivery — workbook, marked-up set, assumptions schedule.
How Pricing and Turnaround Work
Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.
Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.
Tools and Standards
Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 07 — Thermal and Moisture Protection (07 40 00 Roofing and Siding Panels, 07 46 00 Siding).
Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:
- ASTM E2266 and related — design and construction of low-rise frame building wall systems to resist water intrusion
- ASTM C1063 / ASTM C926 — where lath and stucco assemblies interface with the siding scope
- ASTM D3679 — rigid PVC siding specification
- ASTM C1186 — flat fibre cement sheets
- ASCE 7 — wind load provisions setting the cladding attachment requirements and the corner and edge zones
- AAMA 711 and related — flashing tape and self-adhered flashing standards
- Manufacturer installation instructions, which on most cladding products are a condition of the warranty and frequently exceed the code minimum
Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.
Why Siding Is Estimated Wrong
The drainage assembly priced as a percentage. Water-resistive barrier, furring, cavity closure, venting and flashing are the parts of a wall that decide whether it performs. Measuring the visible cladding and allowing a percentage for the rest understates the assembly and, worse, hides whether it was priced at all.
Flashing not counted per condition. Head, sill, jamb, kickout, step and transition flashings each have their own quantity driven by the building's geometry, not its area. Kickout flashing is the one that matters most — omitting a handful of inexpensive pieces at roof-wall junctions is the leading cause of concealed rot in clad walls.
Openings netted without adding the perimeter back. Deducting an opening at its rough size while ignoring the surround trim, flashing and sealant around it understates trim and flashing and overstates the cladding saved. On a heavily fenestrated elevation those two errors do not cancel — the perimeter work exceeds the material saved.
WRB measured at net wall area. Barrier material laps at every horizontal and vertical seam and at every transition. Priced at the net wall area it is short by the lap allowance, which on a tall elevation with many courses is not a trivial figure.
Rainscreen priced as direct-applied. A drained and vented cavity adds furring, closure, venting and a longer fastener that must reach structure. It is a different assembly with different labor, and the two are frequently conflated because the finished face looks the same.
One fastening rate across all elevations. Corner and edge zones require higher fastener density than the field under wind design, and coastal environments may require corrosion-resistant fasteners throughout. A single field rate understates both, and on a high-wind site it may not comply.
Related Estimating Services
Frequently Asked Questions
How do you measure siding quantities?
Net cladding area by system and by elevation rather than one building total, with lap siding quantified at the specified exposure since exposure sets the course count. Trim is measured by profile in linear feet, openings are counted with their surround work, and the assembly behind the cladding is quantified as its own set of line items.
Do you include the water-resistive barrier and flashing?
Yes, always as separate measured items. The WRB is quantified including laps rather than at net wall area, and flashing is counted per condition — head, sill, jamb, kickout, step and transition. This is the part of a siding estimate that decides whether the wall performs, and it is not something to carry as a percentage.
Do you price rainscreen assemblies differently?
Yes, because they are different assemblies. A drained and vented cavity adds furring, cavity closure, venting, insect screen and a longer fastener that has to reach structure through the cavity and any continuous insulation. Pricing it as direct-applied cladding understates it substantially.
Do you account for wind design in the attachment?
Yes. Fastener type and spacing are quantified against the design wind pressure with corner and edge zones separated from the field, and corrosion-resistant fasteners are identified where the cladding material or a coastal environment requires them.
Do you estimate re-siding and renovation work?
Yes. Removal is quantified by area with the number of existing layers stated, along with disposal, substrate repair and any transition detailing at retained construction. Where the documents do not establish the existing assembly, the assumption is stated rather than absorbed — and on older buildings a hazardous materials survey may be required before work starts.
Do you quantify access and staging?
Yes. Area is split by access method — ladder, scaffold, lift or swing stage — since the same square foot is a different labor cost at each, and staging and protection on a constrained site are carried as their own items.
Send us your siding plans and get a quote
Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.
Need to add trades, ZIP code, target date or project state? Use the full quote form ↗