Asphalt and Paving Estimating Services
We quantify paving from your civil drawings — asphalt converted from area to tonnage at the specified section thickness and mix density, with subgrade preparation, aggregate base, curbs, striping and site concrete carried as their own line items — delivered as an editable Excel workbook with the marked-up plan set.
Get a Free QuoteWhat We Take Off
Asphalt is drawn as an area and bought by the ton, and almost every error in a paving estimate lives in that conversion. Section thickness comes from the geotechnical report rather than the site plan, mix density varies by mix type, and the base and subgrade beneath the pavement are frequently a larger cost than the asphalt on top of them. Get the section wrong and the tonnage is wrong by the same proportion across the whole site.
How Asphalt & Paving Quantities Are Measured
Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.
Who This Is For
General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.
Subcontractors pricing their own scope in this division.
Developers and owners validating a number they've already been given.
Material suppliers and distributors verifying a customer's order.
What You Receive
- An itemized Excel takeoff, organized by division
- A marked-up plan set — every quantity traces back to a location on the drawings
- Labor, material and equipment split out separately
- Waste and overage factors shown as visible line items
- An assumptions and exclusions schedule
What Moves the Number on Asphalt & Paving
Section thickness, which is not on the site plan. The pavement section comes from the geotechnical report and the pavement design, not from the paving plan. An estimate built on an assumed section is wrong by the ratio of assumed to actual thickness across the entire paved area, which makes it the single largest error available in this trade. Where the section is not established we say so explicitly rather than assuming a standard one.
Area to tonnage conversion. Asphalt is bought by weight and drawn as an area, and the conversion depends on compacted thickness and on the density of the specified mix. Different mixes have different densities, and applying one factor across all of them introduces an error that scales with the job.
Subgrade condition. What is under the pavement decides more of the cost than the pavement does on a poor site. Undercut and replacement of unsuitable material, moisture conditioning, geotextile separation and geogrid reinforcement are all geotechnical answers, and on weak or wet subgrade they can exceed the asphalt entirely.
Multiple section types on one plan. Parking stalls, drive aisles, truck routes and fire lanes commonly carry different sections on the same site plan. Measuring one total area and applying an average section is wrong on the light-duty areas and wrong on the heavy-duty ones, and the heavy-duty error is the expensive direction.
Concrete work around the asphalt. Curb and gutter, sidewalks, pads, islands, aprons and accessible ramps are a separate trade operation with their own forming, reinforcement, jointing and finishing. On a site with a lot of curb and island work, the concrete can rival the asphalt, and lumping the two together hides it.
Phasing on an operating site. Repaving a site that has to stay open means working in sections, temporary surfacing, traffic control, access maintenance and night or weekend work. The mobilisations multiply, the productivity per mobilisation falls, and both belong in the estimate rather than in a hopeful duration.
Quantity and mobilisation efficiency. Paving is a production trade with meaningful mobilisation cost. A small area, a site split into disconnected pieces, or a schedule that requires the paver to return several times all raise the unit cost substantially over a single large continuous pour. Quantity alone does not predict the price.
What We Need From You
A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.
- Civil site plan and paving plan with areas and section types identified
- Pavement section details and the pavement design — the governing documents, since section thickness sets the tonnage
- Geotechnical report, for subgrade condition, undercut requirements and the pavement design basis
- Grading plan and spot elevations, for excavation and fill volumes to subgrade
- Site details for curb, gutter, sidewalk, ramps and islands
- Striping and signage plan with the marking schedule
- Specification sections for Division 32 flexible and rigid paving, including mix requirements
- Phasing or maintenance-of-traffic requirements where the site stays in operation
How It Works
- 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
- 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
- 3 Approve — nothing starts until you confirm.
- 4 We take it off — quantities from the drawings and schedules.
- 5 Delivery — workbook, marked-up set, assumptions schedule.
How Pricing and Turnaround Work
Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.
Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.
Tools and Standards
Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 32 — Exterior Improvements (32 12 00 Flexible Paving, 32 13 00 Rigid Paving).
Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:
- Asphalt Institute MS-2 — mix design methods
- Superpave / AASHTO M 323 — Superpave volumetric mix design
- ASTM D6926 / D6927 — Marshall specimen preparation and stability testing
- AASHTO pavement design procedures, and the applicable state DOT standard specifications where the project follows them
- ACI 330 — guide for the design and construction of concrete parking lots
- MUTCD — pavement marking and signage requirements
- ADA Standards for Accessible Design — accessible routes, ramps, slopes and detectable warnings
Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.
Why Asphalt & Paving Is Estimated Wrong
Section thickness assumed rather than read. The most consequential error in paving. Section thickness lives in the geotechnical report and the pavement design detail, not on the site plan, and assuming a standard section is wrong by a fixed proportion across every square yard on the job. It is also invisible in the estimate, because the area is right.
One average section across mixed duty areas. Stalls, aisles, truck routes and fire lanes commonly have different sections. Averaging them understates the heavy-duty areas and overstates the light, and because the heavy-duty areas usually carry the traffic, the understatement is the one that shows up as a claim.
Subgrade and undercut left out. Proof rolling, recompaction, moisture conditioning and undercut of unsuitable material are separate items driven by the geotechnical report. On a wet or weak site they can exceed the asphalt, and an estimate that starts at the base course has skipped the expensive part.
Concrete work absorbed into the paving rate. Curb, gutter, sidewalk, islands, pads and ramps are a different operation with different crews, forming and finishing. Rolling them into a square yard paving rate systematically understates a site with a lot of curb and island work, which is most commercial sites.
Accessible ramps and detectable warnings not counted. Curb ramps with detectable warning surfaces are code-driven assemblies with specific slope, landing and surface requirements, and they cost far more per unit than the sidewalk around them. Counted individually they are predictable; absorbed into sidewalk area they disappear.
Tack coat and prime coat omitted. Small, specified, required between lifts and at the base interface, and routinely left out of estimates entirely. Individually minor, but it is a specified item and its absence signals that the section was not read closely.
Related Estimating Services
Frequently Asked Questions
How do you convert paving area to asphalt tonnage?
At the specified compacted thickness and the density of the specified mix, with the conversion basis stated in the estimate so it can be checked. Binder and surface courses are converted separately because they are different mixes at different thicknesses. This conversion is where nearly every paving error originates, so we show it rather than burying it.
What if the pavement section isn't in the drawings?
We say so and state what the estimate assumed. Section thickness comes from the geotechnical report and pavement design rather than the site plan, and an assumed section is wrong by a fixed proportion across the whole job — with the area still looking correct. It is the one assumption in this trade that you should always see stated.
Do you include subgrade preparation and undercut?
Yes, as separate items. Proof rolling, scarifying and recompaction, moisture conditioning, geotextile or geogrid, and undercut and replacement of unsuitable material are quantified against the geotechnical report. On a weak or wet site these can cost more than the asphalt above them.
Do you handle multiple pavement sections on one site?
Yes, each as its own area. Parking stalls, drive aisles, truck routes and fire lanes frequently carry different sections on the same plan, and averaging them is wrong in both directions at once — with the heavy-duty understatement being the one that turns into a claim.
Do you quantify curb, sidewalk and striping?
Yes, all separately. Curb and gutter by linear foot and profile, site concrete by area and thickness with reinforcement and jointing, accessible ramps and detectable warnings counted individually, and striping split into linear runs and counted symbols by marking material.
Do you price phased work on an operating site?
Yes. Sequencing, temporary surfacing, traffic control, access maintenance and any night or weekend requirement are quantified explicitly, along with the additional mobilisations phasing forces. Paving is a production trade and repeated small mobilisations cost substantially more per unit than one continuous operation.
Send us your asphalt & paving plans and get a quote
Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.
Need to add trades, ZIP code, target date or project state? Use the full quote form ↗