Landscaping Estimating and Takeoff Services
We quantify landscape scope from your planting and irrigation drawings — plant material by specified ANSI Z60.1 size, soil and amendment volumes, irrigation by zone and head, and the establishment and warranty period as its own line — delivered as an editable Excel workbook with the marked-up plan set.
Get a Free QuoteWhat We Take Off
Counting plants off a schedule is the easy part of this trade and it is where most estimates stop. What actually decides the number is the specified size of each plant, how much soil has to be imported and amended before anything goes in the ground, how the irrigation is zoned rather than how many heads there are, and how long the contract holds you responsible for keeping it all alive. That last item is months or years of obligation that appears nowhere on a plant schedule.
How Landscaping Quantities Are Measured
Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.
Who This Is For
General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.
Subcontractors pricing their own scope in this division.
Developers and owners validating a number they've already been given.
Material suppliers and distributors verifying a customer's order.
What You Receive
- An itemized Excel takeoff, organized by division
- A marked-up plan set — every quantity traces back to a location on the drawings
- Labor, material and equipment split out separately
- Waste and overage factors shown as visible line items
- An assumptions and exclusions schedule
What Moves the Number on Landscaping
Specified plant size. Plant cost does not rise linearly with size. A large-caliper tree costs a multiple of a small one, needs equipment to place rather than hands, may need a crane on a constrained site, and carries a higher failure risk through establishment. A schedule read for species and count while ignoring specified size will produce a number that has very little to do with the job.
The establishment and maintenance period. Specifications routinely require the contractor to maintain the landscape for a defined period after installation — watering, mowing, weeding, pruning, fertilising and replacing failures. That period is frequently months and sometimes a full year. It is a recurring labor and travel cost that appears nowhere on a plant schedule and is the single most commonly omitted item in this trade.
Plant warranty and replacement risk. A warranty term on plant material is an assumed replacement rate on stock that is alive, seasonal and exposed. The exposure is real and it varies with plant size, species, installation season and how much control the contractor has over watering. We state the replacement assumption rather than pricing a zero failure rate.
Soil volume and quality. Imported topsoil, amendment and engineered planting soil are volume items measured in cubic yards, and they are decided by the specified depth over the planting area rather than by the plants themselves. On a site with poor or compacted existing soil, soil work can exceed the cost of everything planted in it.
Irrigation zoning, not head count. Heads are the visible part and the cheap part. Valves, zone count, mainline routing and sizing, controller capacity, backflow prevention assembly and the point of connection decide the system cost. Two designs with identical head counts and different zoning are not the same price.
Season of installation. Planting outside the appropriate season means higher failure rates, additional watering obligation and sometimes a requirement to hold or re-order stock. Where the schedule puts planting in a difficult season we say so in the assumptions, because the cost lands in warranty replacement rather than in the installation line.
Access and site conditions. Whether equipment can reach the planting areas changes the labor fundamentally. Material hand-carried through a finished building, planted over a structural deck, or placed by crane on a constrained urban site is a different operation from a machine working an open site, and plant size interacts with access directly.
What We Need From You
A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.
- Landscape and planting plans with the plant schedule, including specified sizes
- Irrigation plans showing zoning, head layout, mainline routing and the point of connection
- Landscape specification sections, particularly the establishment period duration and the plant warranty term
- Soil specification — topsoil depth, amendment requirements and any testing obligations
- Grading and drainage plans, for soil volumes and subsurface drainage in planting areas
- Site plan showing access, existing trees to remain and protection requirements
- Details for planting pits, staking, edging, tree grates and any landscape structures
- Where planting is over structure: the structural and waterproofing details governing soil depth and drainage
How It Works
- 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
- 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
- 3 Approve — nothing starts until you confirm.
- 4 We take it off — quantities from the drawings and schedules.
- 5 Delivery — workbook, marked-up set, assumptions schedule.
How Pricing and Turnaround Work
Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.
Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.
Tools and Standards
Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 32 — Exterior Improvements (32 90 00 Planting, with irrigation at 32 80 00).
Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:
- ANSI Z60.1 — American Standard for Nursery Stock, which defines what a specified caliper, height or container size actually means
- ANSI A300 — Tree Care Operations standards, for pruning and protection requirements
- ASTM D5268 — standard specification for topsoil used for landscaping purposes
- Irrigation Association standards for system design, auditing and scheduling
- Local backflow prevention and cross-connection control requirements, which vary by jurisdiction
- Applicable stormwater and erosion control requirements for disturbed areas
Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.
Why Landscaping Is Estimated Wrong
The maintenance and establishment period priced at zero. The most common and most expensive omission in this trade. A twelve-month establishment obligation is a year of scheduled visits — watering, mowing, weeding, pruning and replacement — carried by the contractor after the installation is finished and frequently after retention is released. It is written in the specification and it appears nowhere on the plant schedule, so an estimator working from the drawings alone will miss it entirely.
Plants counted without their specified size. Reading a schedule for species and quantity while ignoring caliper, height or container size produces a plausible-looking count attached to the wrong price. Size drives the material cost, the equipment needed to place it and the failure risk through establishment, and on a specimen tree the difference between two sizes can be an order of magnitude.
Imported soil volume underestimated. Topsoil and amendment are cubic yard quantities set by the specified depth across the planting area. Assuming existing soil is reusable, or carrying a nominal depth where the specification calls for more, understates a large volume item. On a site with compacted or contaminated soil it can be the biggest line in the package.
Irrigation priced by head count. Counting heads and applying a rate ignores zoning, valve count, mainline sizing and routing, controller capacity, backflow prevention and the point of connection — which together carry most of the system cost. Sleeving under paving is a further item that must be coordinated with the paving schedule or it becomes demolition later.
Plant warranty replacement carried at nothing. A warranty term on living material is an assumed failure rate, and assuming zero is not conservatism, it is an omission. The rate varies with size, species, season and watering control, and the honest approach is to state the assumption rather than leave it out and hope.
Access ignored on constrained and over-structure sites. Planting over a podium deck, inside a courtyard with no equipment access, or on a tight urban site is a different operation from open-site work. Material may be hand-carried or craned, soil depth is limited by structure and waterproofing, and drainage becomes an engineered assembly rather than a subgrade condition.
Related Estimating Services
Frequently Asked Questions
How do you quantify landscaping from a planting plan?
Plants are counted by species and by the size the schedule actually specifies — caliper, height or container to ANSI Z60.1 — because size is the price. Groundcover is counted at the specified spacing rather than an assumed density, soil and mulch are volume quantities from the specified depth, and irrigation is quantified by zone, valve and piping run rather than by head count alone.
Do you include the maintenance and establishment period?
Yes, as its own line with the duration stated. It is the most commonly omitted item in landscape estimating — a specified establishment period can run months or a full year of watering, mowing, weeding, pruning and replacement, and it appears nowhere on the plant schedule. If the specification sets a period, you will see what it costs.
How do you handle the plant warranty?
We carry the replacement obligation over the warranty term with the assumed replacement rate stated in the estimate. Living material has a real failure rate that varies with plant size, species, installation season and watering control, and pricing it at zero is an omission rather than a saving.
Do you estimate irrigation systems?
Yes. Mainline and lateral piping by size and length, heads by type, valves and zone count, controller, backflow prevention assembly, sleeving under paving and the point of connection are all quantified. Zoning and valving carry more of the cost than head count does, which is why a head-count rate is not how we price it.
Do you account for soil import and amendment?
Yes, as cubic yard quantities against the specified depth over the planting area, with imported material distinguished from stripped material reused on site. Where the geotechnical or soil information suggests existing soil is not reusable, the import assumption is stated explicitly.
Can you estimate planting over structure?
Yes, and it is priced as its own condition. Soil depth is limited by the structure and the waterproofing assembly, drainage becomes an engineered layer rather than a subgrade condition, material access is frequently by crane or by hand, and weight limits constrain what can be specified. None of that prices like at-grade planting.
Send us your landscaping plans and get a quote
Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.
Need to add trades, ZIP code, target date or project state? Use the full quote form ↗