Insulation Estimating and Takeoff Services
We quantify insulation by assembly and specified R-value — cavity insulation net of framing, continuous insulation outboard of the sheathing, and air sealing as its own scope — and deliver an editable Excel workbook with the marked-up plan set.
Get a Free QuoteWhat We Take Off
Insulation used to be batts between studs. Energy codes moved it, and a current wall assembly is frequently cavity insulation plus continuous insulation outboard of the sheathing plus an air barrier plus the longer fasteners and thermal clips that hold it all together. Estimating that as a single square footage of batt is how this package gets underpriced, and the continuous layer is usually the larger half.
How Insulation Quantities Are Measured
Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.
Who This Is For
General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.
Subcontractors pricing their own scope in this division.
Developers and owners validating a number they've already been given.
Material suppliers and distributors verifying a customer's order.
What You Receive
- An itemized Excel takeoff, organized by division
- A marked-up plan set — every quantity traces back to a location on the drawings
- Labor, material and equipment split out separately
- Waste and overage factors shown as visible line items
- An assumptions and exclusions schedule
What Moves the Number on Insulation
Continuous insulation, which is now the larger half. Energy codes have pushed insulation outboard of the framing, and a current exterior wall frequently carries more R-value in continuous board than in the cavity. That board needs its own fastening — extended fasteners, clips or girts — and a longer fastener through several inches of insulation is a different item from a standard one. Estimating the assembly as cavity batt alone misses most of it.
The framing factor. Cavity insulation fills the cavity, not the wall, and the framing occupies a real and calculable share of a wall's area — more at 16 inches on centre than at 24, and more again around openings and at corners where studs bunch. Using gross wall area overstates the material and, more importantly, hides the thermal bridging the specification may be asking you to address.
Air sealing as a performance requirement. Where a project has an air leakage target, sealing is not an incidental item — it is sealant, tape, gaskets and foam at every joint, penetration and transition, plus the testing and the remedial work if the building does not pass. That is real scope with real labor, and it appears in the specification rather than as a quantity on a drawing.
Material system. Fibreglass batt, mineral wool, cellulose, open-cell foam, closed-cell foam and rigid board differ in R per inch, in installed cost, in fire performance and in vapour behaviour. Substituting one for another to hit an R-value changes the thickness, the assembly and sometimes the vapour control strategy, so we price what is specified and state it.
Access and building type. Insulating an open stud wall before drywall is the fastest condition in this trade. Crawl spaces, low attics, work above finished ceilings and high walls off staging are not comparable, and on a renovation the majority of the work may be in exactly those conditions.
Fire-rated and perimeter containment scope. Safing at slab edges, perimeter fire containment and mineral wool in rated assemblies are engineered systems tested as assemblies, priced by linear foot against a referenced detail. They sit in the same package as thermal insulation and behave nothing like it.
Sequencing with other trades. Insulation goes in after rough-in and before close-in, in a window that other trades control. Partial installation, return visits to insulate after a late MEP change, and standby waiting on inspection are real costs on a compressed programme.
What We Need From You
A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.
- Wall sections and envelope details showing the full assembly, layer by layer
- Wall type schedule, for cavity and acoustic insulation by assembly
- Specification section for Division 07 thermal insulation and the air barrier
- Energy code compliance documentation or the specified R-values and assembly U-factors
- Roof and floor sections, for roof, attic, under-slab and perimeter insulation
- Life-safety plans, for rated assemblies and perimeter fire containment locations
- Reflected ceiling plans, for above-ceiling and plenum conditions
- Any air leakage target and testing requirement stated in the specification
How It Works
- 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
- 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
- 3 Approve — nothing starts until you confirm.
- 4 We take it off — quantities from the drawings and schedules.
- 5 Delivery — workbook, marked-up set, assumptions schedule.
How Pricing and Turnaround Work
Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.
Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.
Tools and Standards
Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 07 — Thermal and Moisture Protection (07 21 00 Thermal Insulation).
Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:
- ASTM C665 — mineral fibre blanket thermal insulation for light frame construction
- ASTM C1289 — faced rigid cellular polyisocyanurate thermal insulation board
- ASTM C578 — rigid cellular polystyrene thermal insulation
- ASTM C1015 / C1149 — installation of loose-fill and sprayed fibre insulation
- ASTM E2178 / E2357 — air permeance of materials and air leakage of air barrier assemblies
- ASTM E779 / ASTM E1827 — building air leakage testing by fan pressurisation
- ASTM E2307 — perimeter fire barrier systems at the slab edge
- The applicable energy code in force for the permit date, which sets the required R-values and continuous insulation provisions
Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.
Why Insulation Is Estimated Wrong
Continuous insulation missed entirely. The defining error in current insulation estimating. A wall assembly with continuous board outboard of the sheathing carries a whole second insulation layer plus its fastening hardware, and an estimate built on cavity batt alone can be short by more than half the package. The information is in the wall section, not the floor plan.
Gross wall area used for cavity insulation. Batt fills the cavity. Using gross wall area overstates material, and more seriously it papers over the framing factor that the energy compliance path may be relying on being addressed. The correct quantity is net of framing at the actual stud spacing.
Air sealing carried as incidental. Where an air leakage target exists, sealing is a specified performance requirement with sealant, tape, gaskets and foam at every joint and penetration, plus testing and the remedial work if the first test fails. Treating it as part of the insulation rate prices none of it.
Fastening for continuous insulation forgotten. Board outboard of the sheathing has to be held by something. Extended fasteners, thermal clips or girts are a real hardware quantity at a specified spacing, and they are absent from any estimate that treats the board as an area and nothing more.
Under-slab and perimeter insulation overlooked. An increasing energy code requirement that sits on foundation sections rather than on wall sections, and is therefore easy to miss entirely when working from the architectural set alone.
Safing priced as thermal insulation. Perimeter fire containment at slab edges is a tested assembly with its own materials, its own linear foot rate and its own inspection. Rolling it into the thermal insulation area rate understates it substantially and misrepresents what was priced.
Related Estimating Services
Frequently Asked Questions
Do you quantify continuous insulation separately from cavity?
Yes, always — they are different materials, different operations and increasingly the continuous layer is the larger half of the package. We also quantify the extended fasteners, thermal clips or girts holding it, which are a real hardware cost that a board area figure does not report.
How do you handle the framing factor?
Cavity insulation is measured net of framing at the actual stud spacing rather than as gross wall area, with additional framing at openings and corners accounted for. Gross area overstates the material and obscures the thermal bridging the energy compliance path may be relying on.
Do you price air sealing?
Yes, as its own scope where the specification calls for it. Sealant, tape, gaskets and foam at joints, penetrations and transitions, measured by condition, plus blower door testing and a stated remedial allowance where the project has an air leakage target.
Do you include perimeter fire containment and safing?
Yes, by linear foot at the slab edge against the referenced tested detail, quantified separately from thermal insulation. It is an engineered assembly with its own materials and inspection and it does not behave like a thermal area rate.
Do you estimate spray foam?
Yes, by area and thickness with open-cell and closed-cell kept separate. They differ in R per inch, in vapour permeance and in price, so the assembly they are used in has to be priced to what is specified rather than to whichever is cheaper.
Do you account for difficult access?
Yes. Crawl spaces, low attics, work above finished ceilings and high walls off staging are quantified separately from open-wall work, because the productivity is not remotely comparable and on renovation projects the difficult conditions can be most of the job.
Send us your insulation plans and get a quote
Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.
Need to add trades, ZIP code, target date or project state? Use the full quote form ↗