Millwork and Casework Estimating and Takeoff Services

We quantify architectural woodwork from your drawings and elevations — casework by unit and configuration, trim by profile and linear foot, panelling and solid surface by area — all priced to the specified AWI grade, and delivered as an editable Excel workbook with the marked-up plan set.

Get a Free Quote

What We Take Off

The first question on any millwork estimate is which AWI grade the specification calls for, and most estimates never answer it. Economy, Custom and Premium are defined grades with different material requirements, different tolerances and different joinery, and the same run of casework at two grades can differ substantially in price. Everything else — hardware, finish, field measuring and installation conditions — sits on top of that decision.

Caseworkcounted by unit and configuration against the elevations, separating base, wall, tall and specialty units, with each size and door or drawer arrangement as its own item
Casework construction typequantified to the specified AWI construction, since flush overlay, reveal overlay and face frame are different builds at different costs
Countertopsby linear foot or area with material specified, separating plastic laminate, solid surface, quartz, natural stone, stainless and epoxy resin, which span a very wide cost range
Countertop detailedge profile, backsplash, sidesplash, cutouts for sinks and fittings, seams and support brackets, each counted rather than absorbed into a linear rate
Standing and running trimby linear foot and profile, separating base, casing, chair rail, crown, aprons and stops, with paint-grade and stain-grade kept apart
Panelling and wall systemsby area with the panel layout, reveals, stiles, rails and any acoustic or fire-rated substrate requirement
Doors within the millwork packageflush and stile-and-rail wood doors by unit with the veneer, core and finish specified, where this package carries them
Specialty itemsreception desks, transaction counters, nurse stations, library and display units, counted individually because they are one-off fabrications rather than repeated units
Shelving and storageadjustable and fixed shelving by linear foot with standards, brackets and supports
Hardwarehinges, drawer slides, pulls, locks, closers and specialty hardware counted by unit and by specified grade, since hardware quality on casework is a substantial share of the cost
Accessorieswire management, waste units, file hardware, pull-outs and appliance interfaces where the drawings show them
Veneer and material selectionspecies, cut, match and sequence, since sequence-matched veneer on a feature wall is a different purchase entirely from ordinary flitch
Finishshop-applied finish system and sheen by area, with field finishing and touch-up separated, because shop and field finishing are different operations at different rates
Blocking and backing coordinationthe in-wall backing that casework and wall-hung millwork require, flagged even where another trade installs it, since it must exist before installation
Field measuring and templatinga real scheduled activity between framing and fabrication, particularly for stone and solid surface countertops
Delivery, hoisting and protectionlarge fabricated assemblies frequently cannot be carried in through a finished building, which is a planning and cost item on renovation work
Installation conditionsout-of-plumb walls, out-of-level floors, scribing and site adjustment, which is most of the difference between shop cost and installed cost
Attic stock and spare materialwhere the specification requires it

How Millwork & Casework Quantities Are Measured

Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.

CaseworkEA by unit and sizeCounted by unit against the elevations, not by linear foot of run. A tall storage unit and a base cabinet are not interchangeable.
CountertopsLF or SF by materialBy material, which spans a very wide cost range from laminate to natural stone.
Countertop detailLF and EAEdge profile, splash, cutouts, seams and supports counted separately — they are a real share of countertop cost.
TrimLF by profileBy profile and by finish grade. Paint-grade and stain-grade are different material and different care.
PanellingSF by systemWith layout, reveals and substrate, since a panelled wall is an assembly rather than a surface.
Specialty itemsEA, priced individuallyReception desks and similar are one-off fabrications and cannot be rated against standard casework.
HardwareEA by item and gradeHinges, slides, pulls and locks by specified grade. On casework this is a substantial share of cost.
VeneerSF with match and sequenceSequence-matched and set-matched veneer is a different purchase from ordinary flitch at the same area.
Shop finishSF by systemSeparated from field finishing and touch-up, which run at different rates.
Field measuringby area or visitA scheduled activity between framing and fabrication, not an overhead.
Installationby unit and conditionScribing to out-of-plumb and out-of-level conditions is most of the gap between shop cost and installed cost.
Delivery and hoistingby assemblyLarge fabrications frequently cannot be carried through a finished building, which is a planning cost on renovation.

Who This Is For

General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.

Subcontractors pricing their own scope in this division.

Developers and owners validating a number they've already been given.

Material suppliers and distributors verifying a customer's order.

What You Receive

  • An itemized Excel takeoff, organized by division
  • A marked-up plan set — every quantity traces back to a location on the drawings
  • Labor, material and equipment split out separately
  • Waste and overage factors shown as visible line items
  • An assumptions and exclusions schedule
Marked-up millwork & casework plan crop

What Moves the Number on Millwork & Casework

AWI grade. Economy, Custom and Premium are defined grades with different material requirements, tolerances, joinery and finish standards, and the same elevation at two grades is two different prices. It is written in the specification and it is the first thing that should be established on any millwork estimate. An estimate that does not state the grade it priced has not answered the main question.

Material and veneer selection. Plastic laminate, thermofoil, wood veneer, solid hardwood and solid surface span a wide range, and within veneer the species, cut, match and sequence matter enormously. Sequence-matched veneer across a feature wall means a reserved flitch, a layout drawing and an approval cycle — a different purchase entirely from ordinary panel stock at the same area.

Hardware grade. Hinges, drawer slides, pulls and locks on casework carry a wide quality range, and soft-close, full-extension, heavy-duty and institutional-grade hardware are real premiums multiplied by a large count. On a building with hundreds of cabinet doors and drawers, hardware grade moves the package materially.

Countertop material and detail. The countertop is frequently the most expensive part of a casework run, and the edge profile, splash treatment, seams, cutouts and support add substantially to the material. Stone and quartz also need templating after installation of the base units, which puts a fabrication lead time inside the finishing programme.

Custom and one-off fabrications. Reception desks, transaction counters, nurse stations and feature joinery are one-off items with shop drawings, engineering, approval cycles and no repetition to recover setup against. They cannot be rated against standard casework and pricing them by linear foot is how these packages get badly underbid.

Field conditions and scribing. Shop cost and installed cost diverge because buildings are not square. Scribing casework to out-of-plumb walls, shimming to out-of-level floors, coping trim to irregular surfaces and adjusting to actual dimensions is most of the installation labor, and it is worse on renovation work than new build by a wide margin.

Lead time and approval cycles. Architectural woodwork is fabricated to shop drawings that require submission, review and approval before production, and specified veneer or stone may need sample approval on top. That sequence sits on the finishing critical path, and a late approval is a schedule problem rather than a cost one — until it becomes both.

What We Need From You

A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.

  • Interior elevations for every millwork and casework location
  • Millwork details and sections showing construction, edge conditions and reveals
  • Room finish schedule and material legend identifying species, laminate and finish
  • Specification section for Division 06 architectural woodwork — the governing document, since it names the AWI grade
  • Casework schedule where one is provided, with unit types and configurations
  • Countertop material schedule with edge profiles and splash requirements
  • Hardware schedule or specification for casework hardware grade
  • Plumbing and electrical drawings for sink, fitting and power cutouts in countertops and casework
  • Floor plans showing wall types, for blocking and backing coordination

How It Works

  1. 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
  2. 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
  3. 3 Approve — nothing starts until you confirm.
  4. 4 We take it off — quantities from the drawings and schedules.
  5. 5 Delivery — workbook, marked-up set, assumptions schedule.

How Pricing and Turnaround Work

Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.

Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.

Tools and Standards

Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 06 — Wood, Plastics and Composites (06 40 00 Architectural Woodwork).

Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:

  • AWI/AWMAC/WI Architectural Woodwork Standards — the grade definitions Economy, Custom and Premium, and the construction requirements for each
  • AWI Quality Certification Program requirements, where the specification calls for certification
  • ANSI/BHMA standards for casework and door hardware grades
  • ANSI/HPVA HP-1 — hardwood and decorative plywood
  • ANSI A208.1 / A208.2 — particleboard and medium density fibreboard
  • NEMA LD 3 — high-pressure decorative laminates
  • Applicable formaldehyde emission requirements for composite wood products

Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.

Why Millwork & Casework Is Estimated Wrong

AWI grade never established. The main question in this trade, and it is answered in the specification rather than on the drawings. An estimate that prices casework without stating whether it is Economy, Custom or Premium has priced an unknown, and the gap between grades on a large package is not a margin adjustment.

Casework priced by linear foot. A linear foot rate treats a simple base cabinet and a tall multi-drawer unit as the same thing. Counting by unit and configuration is more work and it is the only way the estimate reflects what is actually being built, especially where the elevations carry a mix of unit types.

Specialty items rated against standard casework. A reception desk is a one-off fabrication with shop drawings, engineering and an approval cycle, and no repetition to spread setup across. Pricing it against a casework rate understates it badly, and these items are usually the ones the client cares most about.

Countertop detail absorbed into a linear rate. Edge profile, backsplash, cutouts, seams and support brackets are individually priced items that together can approach the cost of the countertop surface. A single linear foot rate hides all of them and is systematically low on any run with many sinks or complex edges.

Hardware grade assumed. Soft-close, full-extension and institutional-grade hardware carry real premiums against a very large count. Assuming standard hardware where the specification calls for a higher grade produces an error multiplied by every door and drawer in the building.

Field conditions and scribing not priced. The difference between shop cost and installed cost is scribing, shimming and adjusting to a building that is not square. On renovation work this can exceed the shop labor, and an estimate that prices fabrication and adds a nominal install figure has priced the easy half.

Frequently Asked Questions

Do you price to a specific AWI grade?

Yes, and we state which one on the face of the estimate. Economy, Custom and Premium are defined grades with different materials, tolerances and joinery, and the same elevation at two grades is two different prices. If the specification does not name a grade, we say so and state what we assumed.

Do you count casework by unit or by linear foot?

By unit and configuration against the elevations. A linear foot rate treats a simple base cabinet and a tall multi-drawer unit as equivalent, which they are not. Counting by unit is more work and it is the only way the estimate reflects what is actually being built.

How do you handle countertops?

Material by linear foot or area, then edge profile, backsplash, sidesplash, cutouts, seams and support brackets counted as their own items. Those details together can approach the cost of the surface itself, and a single linear rate hides all of them.

Do you include hardware?

Yes, by item and specified grade — hinges, slides, pulls, locks and specialty hardware. On casework the hardware grade is a substantial share of cost multiplied by a very large count, so assuming standard where a higher grade is specified is a large and avoidable error.

Do you estimate custom fabrications like reception desks?

Yes, individually. These are one-off items with shop drawings, engineering, approval cycles and no repetition to recover setup against, so they cannot be rated against standard casework. Pricing them by linear foot is how millwork packages get badly underbid.

Do you account for field conditions and installation?

Yes. Scribing to out-of-plumb walls, shimming to out-of-level floors and adjusting to actual dimensions is most of the gap between shop cost and installed cost, and it is substantially worse on renovation than on new build. Field measuring and templating are priced as the scheduled activities they are.

Send us your millwork & casework plans and get a quote

Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.

Need to add trades, ZIP code, target date or project state? Use the full quote form ↗

What do you need quoted?
Accepted file types: PDF, DWG, DXF, DOC, DOCX, JPG, PNG, TIF, ZIP. Maximum 100 megabytes per file.

We’ll reply with your price and delivery date before any work starts. Your plans are used only to prepare your quote.