Millwork and Casework Estimating and Takeoff Services
We quantify architectural woodwork from your drawings and elevations — casework by unit and configuration, trim by profile and linear foot, panelling and solid surface by area — all priced to the specified AWI grade, and delivered as an editable Excel workbook with the marked-up plan set.
Get a Free QuoteWhat We Take Off
The first question on any millwork estimate is which AWI grade the specification calls for, and most estimates never answer it. Economy, Custom and Premium are defined grades with different material requirements, different tolerances and different joinery, and the same run of casework at two grades can differ substantially in price. Everything else — hardware, finish, field measuring and installation conditions — sits on top of that decision.
How Millwork & Casework Quantities Are Measured
Every quantity below is reported in the unit the scope is actually bought and bid in — not converted into a single convenient unit that hides where the cost sits.
Who This Is For
General contractors carrying this trade directly, or checking a subcontractor's number before it goes into the bid.
Subcontractors pricing their own scope in this division.
Developers and owners validating a number they've already been given.
Material suppliers and distributors verifying a customer's order.
What You Receive
- An itemized Excel takeoff, organized by division
- A marked-up plan set — every quantity traces back to a location on the drawings
- Labor, material and equipment split out separately
- Waste and overage factors shown as visible line items
- An assumptions and exclusions schedule
What Moves the Number on Millwork & Casework
AWI grade. Economy, Custom and Premium are defined grades with different material requirements, tolerances, joinery and finish standards, and the same elevation at two grades is two different prices. It is written in the specification and it is the first thing that should be established on any millwork estimate. An estimate that does not state the grade it priced has not answered the main question.
Material and veneer selection. Plastic laminate, thermofoil, wood veneer, solid hardwood and solid surface span a wide range, and within veneer the species, cut, match and sequence matter enormously. Sequence-matched veneer across a feature wall means a reserved flitch, a layout drawing and an approval cycle — a different purchase entirely from ordinary panel stock at the same area.
Hardware grade. Hinges, drawer slides, pulls and locks on casework carry a wide quality range, and soft-close, full-extension, heavy-duty and institutional-grade hardware are real premiums multiplied by a large count. On a building with hundreds of cabinet doors and drawers, hardware grade moves the package materially.
Countertop material and detail. The countertop is frequently the most expensive part of a casework run, and the edge profile, splash treatment, seams, cutouts and support add substantially to the material. Stone and quartz also need templating after installation of the base units, which puts a fabrication lead time inside the finishing programme.
Custom and one-off fabrications. Reception desks, transaction counters, nurse stations and feature joinery are one-off items with shop drawings, engineering, approval cycles and no repetition to recover setup against. They cannot be rated against standard casework and pricing them by linear foot is how these packages get badly underbid.
Field conditions and scribing. Shop cost and installed cost diverge because buildings are not square. Scribing casework to out-of-plumb walls, shimming to out-of-level floors, coping trim to irregular surfaces and adjusting to actual dimensions is most of the installation labor, and it is worse on renovation work than new build by a wide margin.
Lead time and approval cycles. Architectural woodwork is fabricated to shop drawings that require submission, review and approval before production, and specified veneer or stone may need sample approval on top. That sequence sits on the finishing critical path, and a late approval is a schedule problem rather than a cost one — until it becomes both.
What We Need From You
A complete set is ideal, but rarely what exists. Send what you have — we will tell you at quote stage what can be quantified firm and what has to be an allowance.
- Interior elevations for every millwork and casework location
- Millwork details and sections showing construction, edge conditions and reveals
- Room finish schedule and material legend identifying species, laminate and finish
- Specification section for Division 06 architectural woodwork — the governing document, since it names the AWI grade
- Casework schedule where one is provided, with unit types and configurations
- Countertop material schedule with edge profiles and splash requirements
- Hardware schedule or specification for casework hardware grade
- Plumbing and electrical drawings for sink, fitting and power cutouts in countertops and casework
- Floor plans showing wall types, for blocking and backing coordination
How It Works
- 1 Send your plans — PDF, DWG, DOC, images or ZIP, up to 100MB per file.
- 2 Get your quote — a flat price for the scope with a delivery date, confirmed in writing.
- 3 Approve — nothing starts until you confirm.
- 4 We take it off — quantities from the drawings and schedules.
- 5 Delivery — workbook, marked-up set, assumptions schedule.
How Pricing and Turnaround Work
Every project is priced individually from your drawings. Send the plan set and you get a flat quote for the scope before any work starts — no hourly billing, no open-ended engagement.
Turnaround depends on the size of the package and how many trades are in scope — which is why you get a firm delivery date with your quote rather than a generic promise.
Tools and Standards
Takeoffs are produced in Bluebeam, PlanSwift, Trimble, STACK, organized against CSI MasterFormat divisions — this scope is specified under Division 06 — Wood, Plastics and Composites (06 40 00 Architectural Woodwork).
Quantities and assemblies are read against the published standards that govern this trade, because the standard is what decides whether two apparently identical items are actually the same line item:
- AWI/AWMAC/WI Architectural Woodwork Standards — the grade definitions Economy, Custom and Premium, and the construction requirements for each
- AWI Quality Certification Program requirements, where the specification calls for certification
- ANSI/BHMA standards for casework and door hardware grades
- ANSI/HPVA HP-1 — hardwood and decorative plywood
- ANSI A208.1 / A208.2 — particleboard and medium density fibreboard
- NEMA LD 3 — high-pressure decorative laminates
- Applicable formaldehyde emission requirements for composite wood products
Pricing is built on RSMeans cost data localized to your project's market, then reconciled against current supplier quotes and our own completed project costs. Every estimate states its pricing basis and the date it was priced.
Why Millwork & Casework Is Estimated Wrong
AWI grade never established. The main question in this trade, and it is answered in the specification rather than on the drawings. An estimate that prices casework without stating whether it is Economy, Custom or Premium has priced an unknown, and the gap between grades on a large package is not a margin adjustment.
Casework priced by linear foot. A linear foot rate treats a simple base cabinet and a tall multi-drawer unit as the same thing. Counting by unit and configuration is more work and it is the only way the estimate reflects what is actually being built, especially where the elevations carry a mix of unit types.
Specialty items rated against standard casework. A reception desk is a one-off fabrication with shop drawings, engineering and an approval cycle, and no repetition to spread setup across. Pricing it against a casework rate understates it badly, and these items are usually the ones the client cares most about.
Countertop detail absorbed into a linear rate. Edge profile, backsplash, cutouts, seams and support brackets are individually priced items that together can approach the cost of the countertop surface. A single linear foot rate hides all of them and is systematically low on any run with many sinks or complex edges.
Hardware grade assumed. Soft-close, full-extension and institutional-grade hardware carry real premiums against a very large count. Assuming standard hardware where the specification calls for a higher grade produces an error multiplied by every door and drawer in the building.
Field conditions and scribing not priced. The difference between shop cost and installed cost is scribing, shimming and adjusting to a building that is not square. On renovation work this can exceed the shop labor, and an estimate that prices fabrication and adds a nominal install figure has priced the easy half.
Related Estimating Services
Frequently Asked Questions
Do you price to a specific AWI grade?
Yes, and we state which one on the face of the estimate. Economy, Custom and Premium are defined grades with different materials, tolerances and joinery, and the same elevation at two grades is two different prices. If the specification does not name a grade, we say so and state what we assumed.
Do you count casework by unit or by linear foot?
By unit and configuration against the elevations. A linear foot rate treats a simple base cabinet and a tall multi-drawer unit as equivalent, which they are not. Counting by unit is more work and it is the only way the estimate reflects what is actually being built.
How do you handle countertops?
Material by linear foot or area, then edge profile, backsplash, sidesplash, cutouts, seams and support brackets counted as their own items. Those details together can approach the cost of the surface itself, and a single linear rate hides all of them.
Do you include hardware?
Yes, by item and specified grade — hinges, slides, pulls, locks and specialty hardware. On casework the hardware grade is a substantial share of cost multiplied by a very large count, so assuming standard where a higher grade is specified is a large and avoidable error.
Do you estimate custom fabrications like reception desks?
Yes, individually. These are one-off items with shop drawings, engineering, approval cycles and no repetition to recover setup against, so they cannot be rated against standard casework. Pricing them by linear foot is how millwork packages get badly underbid.
Do you account for field conditions and installation?
Yes. Scribing to out-of-plumb walls, shimming to out-of-level floors and adjusting to actual dimensions is most of the gap between shop cost and installed cost, and it is substantially worse on renovation than on new build. Field measuring and templating are priced as the scheduled activities they are.
Send us your millwork & casework plans and get a quote
Upload your plans or tell us what you need. We’ll reply with pricing and a delivery date.
Need to add trades, ZIP code, target date or project state? Use the full quote form ↗